| ................................................................. |
...................................................................................................................................................................... |
| DESIGN & INSTALLATION |
|
|
- Building Surveys carried out to determine Heating, Cooling and Air Conditioning requirements.
- Liaise with clients from project conception to completion.
- Energy efficient and environmentally friendly Plant and Equipment selected and installed
- Capital costs claimable against Corporation Tax for Class A Energy plant and equipment – as per the enhanced Capital Allowance Scheme.
- Customised systems designed, installed and commissioned by our team of experts.
- All controls and power supply requirements are determined by our specialists to ensure optimum energy savings.
- Computerised Building Management Systems designed and installed to meet project requirements.
- Our experienced Commissioning Engineers carry out the regulating and balancing of the Heating, Ventilation and Chilled Water Systems, as per CIBSE Regulations, to ensure design parameters are being met.
- Job specific Method Statements, Risk Assessments and Programmes of Work issued in accordance with statutory Health and Safety requirements.
- Project specific Operating and Maintenance Manuals and AutoCAD drawings compiled and submitted to the client on project completion.
- Complete set of Testing and Commissioning Certificates, Wiring Diagrams and a description of all systems issued for your records.
- All project requirements met by one company.
|
| |
|
| |
Back to top >> |
| |
|
| |
|
| |
|
| |
|
| ................................................................. |
...................................................................................................................................................................... |
| PROJECT MANAGEMENT |
|
|
-
Tender documentation
-
Appointment of sub contractors
-
Works programme
-
Review system of drawings
-
Data sheets and instruction schedules
-
Witness testing of specialist manufacturers plant
-
Programme monitoring and attendance at site meetings
-
Carry out checks in accordance with contract documentation
-
Demonstrate, record and report on installation performance
-
Organise and contribute to training of client personnel
|
| |
|
| |
Back to top >> |
| |
|
| |
|
| |
|
| |
|
| ................................................................. |
...................................................................................................................................................................... |
| SERVICE & FACILITIES MANAGEMENT |
|
|
-
Mobile, multi-skilled technicians can service all types of Heating, Ventilation and Air Conditioning plant.
-
All Maintenance Routines and Scheduled Visits are computerised and a tailored Check List is used by our engineers for each system.
-
Automatic 24-Hour Emergency Call-Out Service provided 7 days per week for Service customers.
-
Normal initial response time, 2-4 hours from point of contact made directly with our engineer via our Emergency Call-Out System, depending on site location.
-
Our Mobile Technicians carry a basic stock of spares in their vehicles to cover minor repairs and replacements.
-
Alterations and Modifications carried out to existing services to suit changes in the internal layout of the building.
-
Advice available from our experienced Design Engineers on the condition and life expectancy of major plant items and equipment.
-
Energy saving strategies identified and highlighted.
-
Our experienced Commissioning and Trouble-Shooting Engineers can investigate and diagnose problematic systems and carry out environmental tests using Data Loggers and Noise Level Meters.
-
Routine sampling of water systems carried out to determine correct dosage levels of corrosion inhibitor.
-
Computerised BMS Control Monitoring Systems designed and installed to suit your requirements.
-
Routine Monitoring and Testing of local Exhaust Ventilation Systems carried out in accordance with COSHH Regulations.
|
| |
|
| |
Back to top >> |
| |
|
| |
|
| |
|
| |
|
| ................................................................. |
...................................................................................................................................................................... |
| WATER & AIR HYGIENE |
|
|
-
Surveys and Risk Assessments to HS[G]70
-
Water treatment consultative services
-
Log books with maintenance procedures and schedules
-
Calorifier descaling, cleaning and disinfecting
-
Hot and Cold services cleaning and disinfecting
-
Pre-commissioning and chemical cleaning
-
Dosage equipment and water treatment plant
-
Industrial effluent treatment plant
-
Storage tanks refurbishment and replacement
-
Cooling tower operation and maintenance
|
| |
|
| |
Back to top >> |
| |
|
| |
|
| |
|
| |
|
| ................................................................. |
...................................................................................................................................................................... |
| BMS CONTROL SYSTEMS |
|
|
-
Building management systems
-
Design and manufacture of control systems
-
Condition surveys of existing systems
-
Energy savings through control modifications
-
Upgrade of control systems and panels
-
Remote computerised monitoring of systems
-
Preventative maintenance of control systems and panels
-
Investigation, diagnostic reporting and rectification of problematic systems
|
| |
Back to top >> |
| |
|
| |
|
| |
|
| |
|
| |
|
| ................................................................. |
...................................................................................................................................................................... |
| CONDITION SURVEYS |
|
|
-
Condition survey of existing systems and plant
-
Upgrading of existing systems and plant
-
Investigation, diagnostic reporting and rectification of problematic systems
-
Safe de-gassing of plant and systems
-
Preventative maintenance of plant and systems
|
| |
|
| |
Back to top >> |