| CASE STUDIES | |
| Our clients comprise an extensive range of public bodies and private companies.
As the Case Studies illustrate we are equipped to undertake the entire spectrum of contracts within our industry.
|
|
| ................................................................ | .................................................................................................................................................................. | |
| The DOME | ||
George Street, Edinburgh |
Located in the heart of Edinburgh’s New Town, The DOME opened in 1996 and has become established as a First Choice Venue for coffee, cocktails, lunch and dinner. In 2006 we carried out a detailed survey of the premises to establish the best means of upgrading the existing Heating System. We subsequently supplied and installed four gas-fired Hamworthy Boilers, complete with a shunt circuit and a new inverter driven Dual Smart Pump Set which provides heating to the various zones as required; the thermostatic valves fitted on each radiator improve energy efficiency by supplying on demand. A Satchwell BMS System was incorporated to control the heating requirements, utilising compensated control for energising the Boiler Plant and controlling the operation of the circulating pumps and motorised valves for each zone as required. |
|
| ................................................................ | .................................................................................................................................................................. | |
| OPTOS | ||
Dunfermline![]() |
Located in Dunfermline, Optos is a leading medical technology company for the design, development and manufacturing of retinal imaging devices. We were initially commissioned as the Mechanical and Electrical Design and Installation specialists by ESE and provided a very extensive service as detailed below:
|
|
| ................................................................ | .................................................................................................................................................................. | |
| Edinburgh Leisure | ||
|
Edinburgh Leisure are responsible for the operation and maintenance of Leisure and Sports Centre facilities throughout the Edinburgh area. We are contracted to organise and implement the major Mechanical Servicing of all Boiler Plant and Equipment and to clean and chlorinate all Cold Water Storage Tanks and Balance Tanks in all their facilities on an annual basis.This necessitates:
|
|
| ................................................................ | .................................................................................................................................................................. | |
| Dundee University/ Ninewells Hospital |
||
|
Our Dundee Office specialise in the commissioning and trouble-shooting of HVAC Systems and the Water Treatment of Domestic Systems. We have carried out extensive measuring, recording and regulating of Heating and Ventilation throughout the university and hospital complexes. Additionally, we were the Commissioning / Project Managers for the transfer of Kings Cross to Ninewells Hospital; this entailed working in conjunction with the Consultant Engineers from Design Stage to Project Completion. |
|
| ................................................................ | .................................................................................................................................................................. | |
| NCH Scotland (Ltd) | ||
|
Our Water Treatment Technicians carried out Risk Assessments in accordance with L8 – “The control of Legionella bacteria in water systems.” in NCH properties throughout Scotland – National Children’s Homes premises range from small offices to large complexes. CWST’s were cleaned and chlorinated and a routine monitoring regime put in place to ensure that adequate monthly, quarterly, bi-annual and annual checks were being carried out. |
|
| ................................................................ | .................................................................................................................................................................. | |
| ______________________________________________________________________________________ |
| GBS (Building Services) Ltd 4 Thornybank, Dalkeith Midlothian EH22 2NQ View Map Telephone: 0131 663 7899 E-mail:sales@gbsgroup.co.uk |
GBS (Building Services) Ltd Unit 8b, Angus Works Neish Street, Dundee DD3 7JN View Map Telephone: E-mail:sales@gbsgroup.co.uk |
site design by DATA |